This skatepark renewal included the demolition of a large percentage of the existing skatepark and development of a triple spine miniramp setup with rollovers to a central mini flyover and an oververt extension quarterpipe. The existing Concrete and Steel ledge and adjacent slab will be retained and enhanced through resurfacing and painting. A small corten steel ledge also runs along in sections of the new setup giving beginners a smaller ledge to utilise.
"The facility was elongated due to the characteristics of the site. The Skate Path was a great idea that allows for a 120m long flow line with a diverse range of obstacles."