This skatepark renewal looked at resurfacing the existing facility with a small extension in the south western corner and other improvements within the existing footprint. The small extension includes a new quarterpipe with platform and increased flat slab area and additional skate elements including a pyramid with Hubba Ledge, Standard Channel Ledge, Handrail and Stairs and a long rail with wollie end. Mural artwork will occur on all vertical faces in the facility.
"The facility was elongated due to the characteristics of the site. The Skate Path was a great idea that allows for a 120m long flow line with a diverse range of obstacles."