Things are coming together for the Halswell Domain Skatepark Development. Designed by RICH Landscapes and being built by Angus McMillan Concrete a number of the pump track and mini bowl elements have been completed as the team works there way out of the site. With progress coming along smoothly the facility should be completed by early to mid December.
Click here for the original design
"The facility was elongated due to the characteristics of the site. The Skate Path was a great idea that allows for a 120m long flow line with a diverse range of obstacles."