The new Birkenhead Skatepark designed by RICH Landscapes is nearing completion with Contrax Ltd beginning to work there way out of the environment, having completed a number of the main flat slabs through the facility. Project Management is indicating towards the 4th or 11th of November for completion of the skate facility and opening to the public.
Check the original design here
"The facility was elongated due to the characteristics of the site. The Skate Path was a great idea that allows for a 120m long flow line with a diverse range of obstacles."